How much does an arc flash study cost?
It depends mostly on the number of buses (switchboards, panels, and disconnects) in scope and whether one-line drawings already exist. We quote a fixed fee after a short scoping call, so you know the full cost before committing to anything.
How often does an arc flash study need to be updated?
NFPA 70E calls for the arc flash risk assessment to be reviewed at least every five years, and whenever major modifications or renovations change the system. If you have an existing SKM model from us, updates are faster and less expensive.
We already have a study from another firm. Can you update it?
Yes. If the original model files are available we can start from them after verifying the data. If only the PDF report exists, we will tell you honestly whether an update or a new model is the better value.
What do you need from us to start?
The site address, a contact for access, and any existing one-line diagrams or prior studies. We handle the utility fault current request and the field data collection.
Do you install the labels?
Labels are included with every study. Installation can be added to the quote, or your facility staff or electrical contractor can apply them using the location list in the report.